Skip to main content

Practice by topic · No signup

Red Seal Ironworker (Generalist) (420B): F – Erection, assembly and installation practice questions

14 original questions on this part of the exam, each with an explanation and a reference you can check.

What this area covers (34 questions on the exam)

Installing primary and secondary structural members (17), ornamental components and systems (9), and conveyors, machinery and equipment (8): bolting, plumbing, decking, precast, stairs, rails, curtain wall and machinery setting.

Answered 0 / 14Score 0
  1. Question 1 · F – Erection, assembly and installation

    Which CSA standard governs the design, fabrication and erection of structural steel buildings in Canada?

    Show answer without guessing

    Answer: D. CSA S16

    CSA S16 (Design of steel structures) includes requirements for fabrication and erection of structural steel, including bolting, tolerances and temporary bracing. Welding follows CSA W59.

    Check it: CSA S16

  2. Question 2 · F – Erection, assembly and installation

    Can pretensioned A490 (F3125 Grade A490) bolts be reused?

    Show answer without guessing

    Answer: C. No, they must not be reused or retightened after full pretensioning

    Pretensioning stretches high-strength bolts. A490 bolts and galvanized A325 bolts must not be reused. Black A325 bolts may be reused only if approved.

    Check it: CSA S16; RCSC specification

  3. Question 3 · F – Erection, assembly and installation

    What is cross-laminated timber (CLT)?

    Show answer without guessing

    Answer: A. Panels of lumber layers glued at right angles, used as walls and floors

    CLT is an engineered wood panel of crosswise layers. Ironworkers on mass timber projects install panels and steel connections, using the manufacturer's lifting systems.

    Check it: Mass timber construction

  4. Question 4 · F – Erection, assembly and installation

    When installing a column splice, what is usually done first?

    Show answer without guessing

    Answer: D. Bolt the splice plates to hold alignment, then plumb and finish

    Splice plates are bolted to hold the upper column in alignment. After plumbing, splices are fully bolted or welded as detailed.

    Check it: Erection practice

  5. Question 5 · F – Erection, assembly and installation

    What is the main purpose of an erection sequence drawing?

    Show answer without guessing

    Answer: A. To show the order in which members are erected for stability

    Erection sequence drawings show the order and stages, making sure each stage is stable before the next.

    Check it: Erection planning

  6. Question 6 · F – Erection, assembly and installation

    What is a curtain wall?

    Show answer without guessing

    Answer: A. A non-load-bearing exterior wall hung from the structure

    Curtain walls carry their own weight and wind loads to the structure through anchors but do not support floors. Ironworkers often install them.

    Check it: Building terminology

  7. Question 7 · F – Erection, assembly and installation

    What is the purpose of anchor bolt sleeves in machine foundations?

    Show answer without guessing

    Answer: D. To allow slight adjustment of the anchor bolt position

    Sleeves around anchor bolts let the bolt move slightly to align with the machine's holes before grouting.

    Check it: Machinery installation practice

  8. Question 8 · F – Erection, assembly and installation

    Why is a minimum edge distance required for bolt holes in steel members?

    Show answer without guessing

    Answer: B. Holes too close to an edge can tear out under load

    CSA S16 sets minimum edge distances so the steel between the hole and the edge can carry bearing forces without tearing. Field holes must respect these distances.

    Check it: CSA S16 (edge distance)

  9. Question 9 · F – Erection, assembly and installation

    What is the purpose of temporary bracing or guying during steel erection?

    Show answer without guessing

    Answer: C. To keep the partly built frame stable until permanent bracing and decks are complete

    A partly erected frame lacks the stability of the finished building. Temporary bracing, guys and the erection sequence are planned so it can resist wind, erection loads and construction loads at every stage.

    Check it: CSA S16 (erection)

  10. Question 10 · F – Erection, assembly and installation

    How is steel roof deck commonly fastened to supporting steel?

    Show answer without guessing

    Answer: D. With arc spot welds, screws or powder-actuated fasteners as specified

    Deck is fastened to supports and side laps are stitched as the design requires. Fastening provides diaphragm action that braces the building.

    Check it: CSSBI deck guidance; project specifications

  11. Question 11 · F – Erection, assembly and installation

    What is a beam strap or beam anchor used for?

    Show answer without guessing

    Answer: D. Providing a fall arrest anchor on a structural beam

    Beam anchors clamp or wrap around beams to give an anchorage for fall arrest. They must be rated and installed per the manufacturer.

    Check it: CSA Z259.15 (anchorage connectors)

  12. Question 12 · F – Erection, assembly and installation

    Steel delivered to site has damaged paint. Who decides on the repair method?

    Show answer without guessing

    Answer: D. Follow the specification; touch-up is done with the specified coating

    Touch-up of shop coating follows the specification. Damage from handling is repaired after erection where required.

    Check it: Project specifications

  13. Question 13 · F – Erection, assembly and installation

    What is a 'spiral stair' installation challenge?

    Show answer without guessing

    Answer: B. Setting the centre column plumb with treads at even rise and rotation

    Spiral stairs are built around a centre column that must be plumb; treads are set at equal rise and rotation.

    Check it: Ornamental installation practice

  14. Question 14 · F – Erection, assembly and installation

    What is the purpose of a 'come-along' when installing equipment?

    Show answer without guessing

    Answer: A. To pull loads short distances for positioning

    Lever hoists (come-alongs) pull or tension loads for final positioning. They must be rated and used within capacity.

    Check it: ASME B30.21

These are VoltExam questions written for the Red Seal Ironworker (Generalist) Interprovincial Exam, not official exam questions. Take the full free practice test or read the Red Seal Ironworker (Generalist) (420B) guide.

Last checked against Red Seal Program (with provincial and territorial apprenticeship authorities) on .

Practise Red Seal Ironworker (Generalist) (420B) by topic

Want every Red Seal Ironworker (Generalist) (420B) topic and the timed mock exams?

  • ✓ 600 Red Seal Ironworker (Generalist) practice questions, every answer explained and cited
  • ✓ Full-length timed mock exams: 120 questions, 4 hours, scored against 70%
  • ✓ Practise by topic and review every question you missed
  • ✓ Every other Canadian exam on VoltExam included

From

C$8.99/month

3-day free trial · or C$44.99 once for lifetime

Try all 600 free for 3 days

Free trial for new members on the Monthly plan, then C$8.99/month until you cancel. See all plans