Skip to main content

Free practice test · No signup

Free Red Seal Mobile Crane Operator (339A) Practice Test

30 original questions with explanations. Pick an answer to check it instantly.

Answered 0 / 30Score 0
  1. Question 1 · G – Operates crane

    After the rigging is attached and the slack is taken up, what is the best way to start lifting a load?

    Show answer without guessing

    Answer: C. Raise it just clear of the ground and pause to check brakes, rigging, balance

    A short test lift just off the ground lets the operator confirm the brakes hold, the rigging is seated and the load is balanced while a problem can still be corrected safely. Faults found at height are far more dangerous.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 18

  2. Question 2 · B – Hoisting calculations

    A rectangular steel plate measures 2.4 m x 1.2 m x 25 mm thick. Using 7 850 kg/m³ for steel, what is its approximate mass?

    Show answer without guessing

    Answer: A. 565 kg

    Convert the thickness to metres first: 25 mm = 0.025 m. Volume = 2.4 x 1.2 x 0.025 = 0.072 m³, and mass = 0.072 x 7 850 = 565 kg. Using 25 mm as 0.25 m gives ten times too much.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 3

  3. Question 3 · D – Rigging

    Why is a softener or corner protector placed between a wire rope sling and the sharp edge of a steel beam?

    Show answer without guessing

    Answer: D. It reduces cutting and sharp bending of the sling, which would weaken it

    A sharp edge can cut wires and force a tight bend in the rope, both of which cut the sling's strength. Padding or corner protection prevents this. It does not raise the rating or change the sling angle calculation.

    Check it: ASME B30.9 (Slings)

  4. Question 4 · C – Inspects and maintains crane

    What is the main purpose of an anti-two-block device on a crane?

    Show answer without guessing

    Answer: B. To warn or stop motion before the hook block hits the boom-point sheave

    Two-blocking is the hook block or headache ball contacting the boom-point sheave, which can part the rope and drop the load. The anti-two-block device warns the operator or cuts the motions that would cause it. A load indicator handles overload warning.

    Check it: ASME B30.5 (Mobile and locomotive cranes)

  5. Question 5 · E – Plans lift, prepares site and sets up crane

    A crane must be set up beside overhead power lines. As a general rule, how should the lines be treated until the owner confirms otherwise?

    Show answer without guessing

    Answer: B. As energized, even if the lines look insulated

    Power lines must be assumed to be live until the utility owner confirms they are de-energized and grounded. Insulation on the wire, silence, missing signs or a spotter do not make a line safe, and contact can happen through the load or rigging as well.

    Check it: O. Reg. 213/91 (Construction Projects)

  6. Question 6 · A – Common occupational skills

    Which standard hand signal tells the crane operator to hoist the load?

    Show answer without guessing

    Answer: D. Forearm vertical, forefinger pointing up, hand moving in a small horizontal circle

    The hoist signal is the forearm vertical with the forefinger up, making small horizontal circles. The same circle with the arm extended downward and finger down means lower. The other two are the stop and emergency stop signals.

    Check it: ASME B30.5 (Mobile and locomotive cranes)

  7. Question 7 · F – Assembles, disassembles and transports crane

    As a general rule, which configuration is required before a telescopic crane is driven on a public roadway?

    Show answer without guessing

    Answer: A. Boom retracted and cradled, swing lock on, hook secured, outriggers stowed

    For road travel the boom is fully retracted, lowered into its rest or cradle and the swing lock is set. The hook block is secured and the outriggers are fully retracted so nothing can swing, drop or strike traffic or overhead structures.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 14

  8. Question 8 · B – Hoisting calculations

    A telescopic crane's load chart gives 9 650 kg at the planned radius and boom length. The hook block weighs 320 kg and the slings and shackles weigh 85 kg. What is the heaviest load, not counting the rigging, that can be lifted?

    Show answer without guessing

    Answer: C. 9 245 kg

    Everything below the boom tip counts against the chart value, so both the hook block and the rigging are deducted. 9 650 - 320 - 85 = 9 245 kg. Deducting only the block gives 9 330 kg, and only the rigging gives 9 565 kg.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 4

  9. Question 9 · G – Operates crane

    A lift must be set where the operator cannot see the load or the landing area. What is required?

    Show answer without guessing

    Answer: D. A designated signal person who sees the load and has positive radio communication

    In a blind lift the operator depends completely on one designated signal person who can see the load and has continuous, positive communication, usually by radio. Guessing from gauges, line feel or shifting signallers leads to contact and dropped loads.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 22

  10. Question 10 · D – Rigging

    What is the correct rule when the pin of a shackle is damaged or missing?

    Show answer without guessing

    Answer: B. Replace it only with the manufacturer's pin for that shackle

    A shackle's rating depends on the pin supplied for it. Substitute bolts or pins can be the wrong strength or shape and may bend or work loose, so only the manufacturer's matching pin is acceptable. Otherwise the shackle should be replaced.

    Check it: ASME B30.26 (Rigging hardware)

  11. Question 11 · C – Inspects and maintains crane

    Which condition requires a running wire rope on a mobile crane to be removed from service?

    Show answer without guessing

    Answer: A. Six randomly distributed broken wires in one rope lay

    For running rope, six randomly distributed broken wires in one rope lay (or three in one strand in one lay) is a removal criterion. Two broken wires call for closer watching, while light rust or dryness is corrected by cleaning and lubricating.

    Check it: ASME B30.5 (Mobile and locomotive cranes)

  12. Question 12 · E – Plans lift, prepares site and sets up crane

    An outrigger reaction is 180 kN, carried on a square mat measuring 1.2 m x 1.2 m. What is the average ground bearing pressure under the mat?

    Show answer without guessing

    Answer: C. 125 kPa

    Pressure = force / area. Mat area = 1.2 x 1.2 = 1.44 m². 180 kN / 1.44 m² = 125 kPa. Dividing by one side only gives 150 kPa, multiplying by the area gives 216 kPa, and a decimal slip gives 12.5 kPa.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 12

  13. Question 13 · B – Hoisting calculations

    A 6 000 kg load is lifted with a two-leg bridle sling. Each leg makes an angle of 60 degrees with the horizontal. What is the tension in each leg?

    Show answer without guessing

    Answer: B. 3 464 kg

    Leg tension = load / (number of legs x sin of the angle from horizontal) = 6 000 / (2 x 0.866) = 3 464 kg. Ignoring the angle gives 3 000 kg; multiplying by 0.866 instead of dividing gives 5 196 kg.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 5

  14. Question 14 · G – Operates crane

    While holding a load, the operator lowers the boom without changing its length. What happens to the radius and the rated capacity?

    Show answer without guessing

    Answer: D. Radius increases and rated capacity decreases

    Lowering the boom angle moves the load farther from the centre of rotation, so the radius increases. Load charts give lower capacity at larger radius, so the rated capacity drops and the load may become overloaded.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 21

  15. Question 15 · F – Assembles, disassembles and transports crane

    While extending a telescopic boom with a hook block rigged on the main hoist, what must the operator do to avoid two-blocking?

    Show answer without guessing

    Answer: C. Pay out hoist line as the boom extends so the block clears the head

    Extending the boom lengthens the distance the rope must cover, so if the hoist is held the block is drawn up into the boom-point sheave. The operator must lower or pay out the hoist rope while extending to keep the block clear.

    Check it: ASME B30.5 (Mobile and locomotive cranes)

  16. Question 16 · A – Common occupational skills

    A crane operator is working with one designated signal person when another worker gives a clear stop signal. What should the operator do?

    Show answer without guessing

    Answer: A. Stop the motion at once, then find out why before continuing

    A stop signal must be obeyed immediately, no matter who gives it. Once everything is stopped, the operator and the designated signal person can find out the reason and decide whether it is safe to carry on.

    Check it: ASME B30.5 (Mobile and locomotive cranes)

  17. Question 17 · C – Inspects and maintains crane

    With the controls in neutral, the operator sees the boom hoist cylinder slowly settling while it holds a load. What is the correct response?

    Show answer without guessing

    Answer: B. Lower the load to the ground, shut down and tag the crane out for repair

    Cylinder creep under load points to leaking seals or a faulty holding (counterbalance) valve, which can let the boom or load drop. The load should be landed safely, then the crane shut down and tagged out until repaired.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 7

  18. Question 18 · B – Hoisting calculations

    A telescopic boom is 30 m long and is held at 60 degrees above horizontal. Ignoring the boom foot offset and boom deflection, what is the approximate load radius?

    Show answer without guessing

    Answer: D. 15 m

    Radius is the horizontal distance, so radius = boom length x cos(boom angle) = 30 x cos 60° = 30 x 0.5 = 15 m. Using sine gives the boom-tip height of about 26 m, which is a common mix-up.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 4

  19. Question 19 · G – Operates crane

    Two cranes will make a tandem lift. Which arrangement is correct?

    Show answer without guessing

    Answer: A. A qualified person plans the lift and one person directs both operators

    A tandem lift shares the load between cranes, so each one's loading depends on the other's movements. A qualified person plans it, including the load share, and one designated person directs both operators so motions stay coordinated.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 22

  20. Question 20 · E – Plans lift, prepares site and sets up crane

    As a general rule, what limits lifting a large, flat panel in wind?

    Show answer without guessing

    Answer: C. The manufacturer's wind limits, adjusted for the load's size and sail area

    Wind pushes on the load's surface area, not just its weight, so a light but large panel can be uncontrollable. The operator manual and load chart give the maximum wind speed and how to reduce it for large sail area.

    Check it: Crane manufacturer's load chart and operator manual (values given in the question)

  21. Question 21 · D – Rigging

    Which condition requires a synthetic web sling to be removed from service?

    Show answer without guessing

    Answer: D. Broken stitching in a load-bearing splice

    Broken or worn stitching in a load-bearing splice means the sling can no longer carry its rated load and it must be removed. Dust and dampness are not damage, and a legible tag is actually a requirement for keeping a sling in service.

    Check it: ASME B30.9 (Slings)

  22. Question 22 · F – Assembles, disassembles and transports crane

    When assembling a lattice boom on the ground, how should the boom sections be supported?

    Show answer without guessing

    Answer: B. On level blocking that keeps sections straight with pin holes aligned

    Sections are blocked at a suitable height on firm, level cribbing so they sit straight and the pin holes line up without force. Forcing pins with bars or hammers damages the connections and weakens the boom.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 15

  23. Question 23 · G – Operates crane

    When a crane hoists personnel in a platform, which rule applies to the load line?

    Show answer without guessing

    Answer: C. Use power-controlled raising and lowering only; free-fall must not be used

    Personnel must be raised and lowered under controlled power so the platform's movement is always controlled by the operator. Free-fall (free-spooling) is prohibited, regardless of platform load or distance.

    Check it: ASME B30.23 (Personnel lifting systems)

  24. Question 24 · B – Hoisting calculations

    A 10 000 kg load is lifted by a sling at each end of a 4.0 m spreader. The centre of gravity is 1.0 m from sling A. What load does the sling at A carry?

    Show answer without guessing

    Answer: A. 7 500 kg

    The sling nearer the centre of gravity carries more. Load on A = 10 000 x 3.0 / 4.0 = 7 500 kg, and B carries 10 000 x 1.0 / 4.0 = 2 500 kg. An even 5 000 kg split ignores the offset centre of gravity.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 5

  25. Question 25 · C – Inspects and maintains crane

    Which order is correct when removing and then reconnecting a crane battery?

    Show answer without guessing

    Answer: B. Disconnect the negative first and reconnect it last

    The negative terminal is grounded to the frame, so removing it first and reconnecting it last prevents a wrench on the positive terminal from shorting to the chassis and causing sparks or a battery fire.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 8

  26. Question 26 · E – Plans lift, prepares site and sets up crane

    A crane will work in January on ground that is frozen at the surface, and daytime temperatures are expected to rise above 0°C. What is the best practice?

    Show answer without guessing

    Answer: C. Size mats for the unfrozen soil below, since frost can soften as it thaws

    Frost can give a false sense of strength: when the surface thaws, bearing capacity can drop suddenly. Planning outrigger mats for the unfrozen soil bearing keeps the crane stable if the ground softens during the day.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 12

  27. Question 27 · G – Operates crane

    Why must the operator never use the boom to drag a load sideways across the ground?

    Show answer without guessing

    Answer: A. Booms are built for in-line loads, so side pull can damage them or tip the crane

    A boom resists loads in its own plane, not sideways. Side loading can bend or buckle the boom or tip the crane, and the load chart does not allow for it. The load must be lifted clear before it is moved.

    Check it: ASME B30.5 (Mobile and locomotive cranes)

  28. Question 28 · F – Assembles, disassembles and transports crane

    A fly jib is erected on a telescopic boom. How is the lifting capacity determined?

    Show answer without guessing

    Answer: D. From the jib chart for the boom length, jib length and offset used

    With a jib erected, the crane's rated capacities come from the manufacturer's jib chart for the exact boom, jib length and offset angle configuration. Capacities are not added together or approximated from the main boom chart.

    Check it: Crane manufacturer's load chart and operator manual (values given in the question)

  29. Question 29 · G – Operates crane

    Which practice is correct when travelling with a suspended load on a pick-and-carry crane?

    Show answer without guessing

    Answer: B. Carry it low and travel slowly on firm, level ground within the maker's ratings

    Pick-and-carry work is limited by the manufacturer's ratings and needs a low, steady load, slow travel and firm, level ground. High loads, side swinging or long booms move the centre of gravity and risk tipping.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 22

  30. Question 30 · G – Operates crane

    At the end of the shift, which is the correct way to secure a mobile crane?

    Show answer without guessing

    Answer: C. Land the load, secure the hook block, set locks and brakes, shut down, remove keys

    A parked crane should carry no load, with the hook block secured, swing and travel brakes and locks applied, the engine shut down and the keys removed. This prevents unauthorized use and any movement or drift overnight.

    Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 23

These are VoltExam questions written for the Red Seal Mobile Crane Operator Interprovincial Exam, not official exam questions. Each shows the rule or standard to check it against. New to this exam? Read the Red Seal Mobile Crane Operator (339A) guide.

Last checked against Red Seal Program (with provincial and territorial apprenticeship authorities) on .

Practise Red Seal Mobile Crane Operator (339A) by topic

Want the other 570 questions?

  • ✓ 600 Red Seal Mobile Crane Operator practice questions, every answer explained and cited
  • ✓ Full-length timed mock exams: 110 questions, 4 hours, scored against 70%
  • ✓ Practise by topic and review every question you missed
  • ✓ Every other Canadian exam on VoltExam included

From

C$8.99/month

3-day free trial · or C$44.99 once for lifetime

Try all 600 free for 3 days

Free trial for new members on the Monthly plan, then C$8.99/month until you cancel. See all plans