Red Seal Mobile Crane Operator (339A): F – Assembles, disassembles and transports crane practice questions
10 original questions on this part of the exam, each with an explanation and a reference you can check.
What this area covers (15 questions on the exam)
Loading and unloading components for transport (3), driving on public roadways (2), assembling and disassembling lattice boom (4) and telescopic boom cranes (4), and specialty equipment and attachments (2).
Question 1 · F – Assembles, disassembles and transports crane
As a general rule, which configuration is required before a telescopic crane is driven on a public roadway?
Show answer without guessing
Answer: A. Boom retracted and cradled, swing lock on, hook secured, outriggers stowed
For road travel the boom is fully retracted, lowered into its rest or cradle and the swing lock is set. The hook block is secured and the outriggers are fully retracted so nothing can swing, drop or strike traffic or overhead structures.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 14
Question 2 · F – Assembles, disassembles and transports crane
While extending a telescopic boom with a hook block rigged on the main hoist, what must the operator do to avoid two-blocking?
Show answer without guessing
Answer: C. Pay out hoist line as the boom extends so the block clears the head
Extending the boom lengthens the distance the rope must cover, so if the hoist is held the block is drawn up into the boom-point sheave. The operator must lower or pay out the hoist rope while extending to keep the block clear.
Check it: ASME B30.5 (Mobile and locomotive cranes)
Question 3 · F – Assembles, disassembles and transports crane
When assembling a lattice boom on the ground, how should the boom sections be supported?
Show answer without guessing
Answer: B. On level blocking that keeps sections straight with pin holes aligned
Sections are blocked at a suitable height on firm, level cribbing so they sit straight and the pin holes line up without force. Forcing pins with bars or hammers damages the connections and weakens the boom.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 15
Question 4 · F – Assembles, disassembles and transports crane
A fly jib is erected on a telescopic boom. How is the lifting capacity determined?
Show answer without guessing
Answer: D. From the jib chart for the boom length, jib length and offset used
With a jib erected, the crane's rated capacities come from the manufacturer's jib chart for the exact boom, jib length and offset angle configuration. Capacities are not added together or approximated from the main boom chart.
Check it: Crane manufacturer's load chart and operator manual (values given in the question)
Question 5 · F – Assembles, disassembles and transports crane
Counterweight slabs each weigh 2,350 kg. A trailer has a legal payload of 18,000 kg for this move. What is the maximum number of whole slabs it can carry?
Show answer without guessing
Answer: B. 7 slabs
18,000 kg ÷ 2,350 kg = 7.66, so only 7 whole slabs fit (7 × 2,350 = 16,450 kg). An eighth slab would bring the load to 18,800 kg, which is over the payload.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 13
Question 6 · F – Assembles, disassembles and transports crane
An assist crane unloads a 5,200 kg counterweight slab using a 380 kg spreader and 120 kg of rigging. Its chart capacity at the working radius is 7,500 kg. What percentage of capacity is used?
Show answer without guessing
Answer: B. 76%
Load on the hook = 5,200 + 380 + 120 = 5,700 kg. 5,700 ÷ 7,500 = 0.76, or 76%. The lower answers leave out the spreader, the rigging, or both.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 13
Question 7 · F – Assembles, disassembles and transports crane
During assembly, a lattice boom chord is found bent and a lacing member is dented. What should be done?
Show answer without guessing
Answer: B. Tag it out until the manufacturer or an engineer approves a repair
Damaged chords and lacing weaken the boom's column strength, which can lead to sudden buckling. Do not field-repair or use it. Tag it out and have the damage evaluated by qualified people.
Check it: CSA Z150 (Safety code on mobile cranes)
Question 8 · F – Assembles, disassembles and transports crane
A lattice boom is being assembled near overhead power lines. What rule applies?
Show answer without guessing
Answer: B. All parts of the crane and load must stay outside the required clearance distances
Clearance rules apply to the crane at all times, including parts laid out on the ground and while the boom is raised. If clearance cannot be kept, contact the utility to de-energize or protect the lines.
Check it: O. Reg. 213/91 (Construction Projects)
Question 9 · F – Assembles, disassembles and transports crane
A four-section boom is 12.2 m fully retracted and 38.4 m fully extended. With synchronized extension, what is the length at 50% extension?
Show answer without guessing
Answer: D. 25.3 m
Total travel = 38.4 − 12.2 = 26.2 m. Half of this is 13.1 m, and adding it to the retracted length gives 12.2 + 13.1 = 25.3 m. 19.2 m is half of the full length.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 16
Question 10 · F – Assembles, disassembles and transports crane
What is an advantage of a luffing jib compared with a fixed jib?
Show answer without guessing
Answer: D. Radius can be changed by luffing the jib at a steady boom angle
A luffing jib lets the hook reach close in and high, such as at a building face, and adjust radius without moving the main boom. It still has its own load chart and counterweight needs.
Check it: Crane manufacturer's load chart and operator manual (values given in the question)
These are VoltExam questions written for the Red Seal Mobile Crane Operator Interprovincial Exam, not official exam questions. Take the full free practice test or read the Red Seal Mobile Crane Operator (339A) guide.
Free calculators for this exam: Sling Angle and Leg Tension Calculator, Crane Mat Ground Bearing Pressure Calculator.
Last checked against Red Seal Program (with provincial and territorial apprenticeship authorities) on .
Practise Red Seal Mobile Crane Operator (339A) by topic
Want every Red Seal Mobile Crane Operator (339A) topic and the timed mock exams?
- ✓ 600 Red Seal Mobile Crane Operator practice questions, every answer explained and cited
- ✓ Full-length timed mock exams: 110 questions, 4 hours, scored against 70%
- ✓ Practise by topic and review every question you missed
- ✓ Every other Canadian exam on VoltExam included
From
C$8.99/month
3-day free trial · or C$44.99 once for lifetime
Try all 600 free for 3 daysFree trial for new members on the Monthly plan, then C$8.99/month until you cancel. See all plans
Official sources
- Red Seal – Mobile Crane Operator trade page ↗
- Red Seal – Mobile Crane Operator exam breakdown ↗
- Red Seal – Mobile Crane Operator examination weightings ↗
- Red Seal – Mobile Crane Operator exam self-assessment guide (PDF) ↗
- Saskatchewan Apprenticeship – Mobile Crane Operator interprovincial exam information (PDF) ↗
- Skilled Trades Ontario – Hoisting Engineer – Mobile Crane Operator 1 ↗
- Skilled Trades Ontario – Trades information (339A, 339B, 339C) ↗
- Skilled Trades Ontario – Mobile Crane Operator Branch 1 (339A) apprenticeship training standard (PDF) ↗
Sources checked November 14, 2026. VoltExam is independent and not affiliated with Red Seal Program (with provincial and territorial apprenticeship authorities). Rules change: confirm details with the official source before your exam.