Practice by topic · No signup
Red Seal Mobile Crane Operator (339A): C – Inspects and maintains crane practice questions
10 original questions on this part of the exam, each with an explanation and a reference you can check.
What this area covers (14 questions on the exam)
Pre-operational checks and regular inspections (6), operational and continual checks (5) and minor maintenance (3): wire rope, hooks, hydraulics, safety devices, fluids and records.
Question 1 · C – Inspects and maintains crane
What is the main purpose of an anti-two-block device on a crane?
Show answer without guessing
Answer: B. To warn or stop motion before the hook block hits the boom-point sheave
Two-blocking is the hook block or headache ball contacting the boom-point sheave, which can part the rope and drop the load. The anti-two-block device warns the operator or cuts the motions that would cause it. A load indicator handles overload warning.
Check it: ASME B30.5 (Mobile and locomotive cranes)
Question 2 · C – Inspects and maintains crane
Which condition requires a running wire rope on a mobile crane to be removed from service?
Show answer without guessing
Answer: A. Six randomly distributed broken wires in one rope lay
For running rope, six randomly distributed broken wires in one rope lay (or three in one strand in one lay) is a removal criterion. Two broken wires call for closer watching, while light rust or dryness is corrected by cleaning and lubricating.
Check it: ASME B30.5 (Mobile and locomotive cranes)
Question 3 · C – Inspects and maintains crane
With the controls in neutral, the operator sees the boom hoist cylinder slowly settling while it holds a load. What is the correct response?
Show answer without guessing
Answer: B. Lower the load to the ground, shut down and tag the crane out for repair
Cylinder creep under load points to leaking seals or a faulty holding (counterbalance) valve, which can let the boom or load drop. The load should be landed safely, then the crane shut down and tagged out until repaired.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 7
Question 4 · C – Inspects and maintains crane
Which order is correct when removing and then reconnecting a crane battery?
Show answer without guessing
Answer: B. Disconnect the negative first and reconnect it last
The negative terminal is grounded to the frame, so removing it first and reconnecting it last prevents a wrench on the positive terminal from shorting to the chassis and causing sparks or a battery fire.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 8
Question 5 · C – Inspects and maintains crane
Under ASME B30.5, how often are frequent inspections of a mobile crane carried out?
Show answer without guessing
Answer: C. At intervals from daily to monthly, depending on the item and service
Frequent inspections are done at intervals from daily to monthly depending on the item being checked and the severity of service. Periodic inspections are the more detailed ones, done at intervals of one to twelve months.
Check it: ASME B30.5 (Mobile and locomotive cranes) – Task 6
Question 6 · C – Inspects and maintains crane
Before lifting, the operator sets up the load moment indicator (LMI). The setup must match the crane's
Show answer without guessing
Answer: D. actual configuration: boom length, parts of line, counterweight, outriggers
An LMI calculates capacity from what it is told. If the parts of line, counterweight, outrigger or boom information are wrong, its readings are wrong. The operator must enter the true configuration every time it changes.
Check it: ASME B30.5 (Mobile and locomotive cranes)
Question 7 · C – Inspects and maintains crane
Which sheave finding should stop a crane from being used until it is repaired?
Show answer without guessing
Answer: C. A cracked flange or a groove worn to a pinched profile
A cracked flange can break, and a pinched, worn groove grips the rope and wears it quickly. A sheave that turns freely, is lubricated and has guards fitted is in the correct condition.
Check it: ASME B30.5 (Mobile and locomotive cranes)
Question 8 · C – Inspects and maintains crane
The engine oil pressure gauge drops to zero while the crane is running. What should the operator do?
Show answer without guessing
Answer: C. Land any load safely and shut the engine down at once
Zero oil pressure means the engine is no longer being lubricated and can seize within moments. After landing the load safely, shut down immediately and find the cause before restarting.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 7
Question 9 · C – Inspects and maintains crane
A spray of hydraulic fluid is observed from a pinhole in a pressurized hose during a lift. The operator should
Show answer without guessing
Answer: A. land the load, shut down, relieve pressure and replace the hose
Pressurized hydraulic fluid can penetrate the skin and the hose can burst. Land the load, shut down, relieve the system pressure and replace the hose; never use your hand or tape to stop the leak.
Check it: Red Seal Occupational Standard: Mobile Crane Operator – Task 7
Question 10 · C – Inspects and maintains crane
The manufacturer calls for an engine oil change every 250 hours. The last change was at 2,950 h and the hour meter now reads 3,140 h. How many hours remain before the next change?
Show answer without guessing
Answer: D. 60 hours
The engine has run 3,140 − 2,950 = 190 h since the change. Remaining = 250 − 190 = 60 h. The 190 figure is the hours already run, not the hours remaining.
Check it: Crane manufacturer's load chart and operator manual (values given in the question)
These are VoltExam questions written for the Red Seal Mobile Crane Operator Interprovincial Exam, not official exam questions. Take the full free practice test or read the Red Seal Mobile Crane Operator (339A) guide.
Free calculators for this exam: Sling Angle and Leg Tension Calculator, Crane Mat Ground Bearing Pressure Calculator.
Last checked against Red Seal Program (with provincial and territorial apprenticeship authorities) on .
Practise Red Seal Mobile Crane Operator (339A) by topic
Want every Red Seal Mobile Crane Operator (339A) topic and the timed mock exams?
- ✓ 600 Red Seal Mobile Crane Operator practice questions, every answer explained and cited
- ✓ Full-length timed mock exams: 110 questions, 4 hours, scored against 70%
- ✓ Practise by topic and review every question you missed
- ✓ Every other Canadian exam on VoltExam included
From
C$8.99/month
3-day free trial · or C$44.99 once for lifetime
Try all 600 free for 3 daysFree trial for new members on the Monthly plan, then C$8.99/month until you cancel. See all plans
Official sources
- Red Seal – Mobile Crane Operator trade page ↗
- Red Seal – Mobile Crane Operator exam breakdown ↗
- Red Seal – Mobile Crane Operator examination weightings ↗
- Red Seal – Mobile Crane Operator exam self-assessment guide (PDF) ↗
- Saskatchewan Apprenticeship – Mobile Crane Operator interprovincial exam information (PDF) ↗
- Skilled Trades Ontario – Hoisting Engineer – Mobile Crane Operator 1 ↗
- Skilled Trades Ontario – Trades information (339A, 339B, 339C) ↗
- Skilled Trades Ontario – Mobile Crane Operator Branch 1 (339A) apprenticeship training standard (PDF) ↗
Sources checked November 14, 2026. VoltExam is independent and not affiliated with Red Seal Program (with provincial and territorial apprenticeship authorities). Rules change: confirm details with the official source before your exam.