Practice by topic · No signup
Ontario Working at Heights: Warning methods and physical barriers practice questions
8 original questions on this part of the exam, each with an explanation and a reference you can check.
What this area covers
Basic Theory. Warning methods and physical barriers, DANGER signs, the built-up roof barrier, protective coverings over openings, and precautions when installing, relocating or removing guardrails and covers.
Question 1 · Warning methods and physical barriers
A plywood sheet is used to protect workers from an opening in a floor. Which requirement must it meet under O. Reg. 213/91?
Show answer without guessing
Answer: B. It must be securely fastened and adequately identified as covering an opening
A protective covering must completely cover the opening, be securely fastened, be adequately identified as covering an opening, and support all loads it may face, at least 2.4 kN per square metre. A loose or unmarked sheet can be moved or stepped through.
Check it: O. Reg. 213/91, s. 26.3 (2)
Question 2 · Warning methods and physical barriers
A built-up roof is being resurfaced. How far from the roof perimeter must the barrier in the immediate work area be placed?
Show answer without guessing
Answer: A. At least 2 metres
Section 207 requires a barrier at least two metres from the perimeter of a built-up roof under construction, repair or resurfacing. It consists of weighted posts supporting a taut chain, cable or rope 1.1 metres above the roof level.
Check it: O. Reg. 213/91, s. 207
Question 3 · Warning methods and physical barriers
What is the purpose of a warning method such as a warning line or barrier on a roof?
Show answer without guessing
Answer: B. To alert workers that they are approaching an edge or hazardous area
Warning methods give a visual or physical cue that a hazard is near. They do not stop or arrest a fall, so they are used with other controls.
Check it: WAH Program Standard, Warning methods and physical barriers
Question 4 · Warning methods and physical barriers
A guardrail must be removed temporarily to land materials at a floor edge. What does s. 26.3 (3) require?
Show answer without guessing
Answer: D. Workers must be adequately protected and DANGER signs posted
Section 26.3 (3) allows temporary removal of a guardrail or cover to work in or around the opening only if workers are adequately protected and signs are posted in accordance with s. 44.
Check it: O. Reg. 213/91, s. 26.3 (3)
Question 5 · Warning methods and physical barriers
On a built-up roof job, a worker must go between the 2 metre barrier and the roof edge. What applies?
Show answer without guessing
Answer: A. The worker must be protected by another method of fall protection in that area
The barrier marks the safe work area. Anyone working between the barrier and the edge is exposed to the fall hazard and must be protected under s. 26.1.
Check it: O. Reg. 213/91, ss. 26.1, 207
Question 6 · Warning methods and physical barriers
What should be checked on a guardrail before workers rely on it?
Show answer without guessing
Answer: C. That rails, posts and toe board are present, secure and undamaged
Guardrails can be damaged, loosened or partly removed during work. Checking the components keeps them able to resist the loads in s. 26.3 (5).
Check it: O. Reg. 213/91, s. 26.3; WAH Program Standard
Question 7 · Warning methods and physical barriers
A floor opening is 1.2 m by 1.2 m. What live load capacity must its protective cover have at minimum, based on 2.4 kN/m²?
Show answer without guessing
Answer: C. About 3.5 kilonewtons spread over the opening
The area is 1.2 × 1.2 = 1.44 m². At 2.4 kN/m², the cover must carry at least about 3.46 kN, and more if heavier loads will be placed on it.
Check it: O. Reg. 213/91, s. 26.3 (2)
Question 8 · Warning methods and physical barriers
A worker on a roof sees a protective cover marked "HOLE" with fastened edges. What should the worker do?
Show answer without guessing
Answer: A. Leave it in place and not store materials on it beyond its rating
Covers must stay secured and identified. Removing or misusing them exposes the opening. Only authorized removal with protection and signs is allowed.
Check it: O. Reg. 213/91, s. 26.3 (2)-(3)
These are VoltExam questions written for the Ontario Working at Heights Training Test (CPO-Approved Program), not official exam questions. Take the full free practice test or read the Ontario Working at Heights guide.
Last checked against Ontario Ministry of Labour, Immigration, Training and Skills Development (Chief Prevention Officer) on .
Practise Ontario Working at Heights by topic
Want every Ontario Working at Heights topic and the timed mock exams?
- ✓ 600 Ontario Working at Heights practice questions, every answer explained and cited
- ✓ Full-length timed mock exams: 40 questions, 1 hours, scored against 75%
- ✓ Practise by topic and review every question you missed
- ✓ Every other Canadian exam on VoltExam included
From
C$8.99/month
3-day free trial · or C$44.99 once for lifetime
Try all 600 free for 3 daysFree trial for new members on the Monthly plan, then C$8.99/month until you cancel. See all plans
Official sources
- Ontario: Training for working at heights ↗
- Ontario: Working at heights training program standard ↗
- Ontario: Working at heights training provider standard ↗
- e-Laws: O. Reg. 297/13 Occupational Health and Safety Awareness and Training ↗
- e-Laws: O. Reg. 213/91 Construction Projects ↗
- e-Laws: Occupational Health and Safety Act, R.S.O. 1990, c. O.1 ↗
Sources checked November 3, 2026. VoltExam is independent and not affiliated with Ontario Ministry of Labour, Immigration, Training and Skills Development (Chief Prevention Officer). Rules change: confirm details with the official source before your exam.